A challenging scheme based on its location, Trident Facades were initially awarded the scaffolding on the 25m residential building but were delighted to pick up the glazing package after the main contractor was let down. Pleased to say the results were stunning.
This beautiful 15 storey aluminum rainscreen project was completed in 48 weeks from start to finish including scaffolding, replacement of all insulation and cavity barriers.
This slick residential rainscreen cladding project was something to behold, its 22m façade was stripped and replaced with A1/A” fire rated products with the absolute minimum of disruption to its residents earning us the contractor of the projects award.
Scaffolding the 18m EWI rendering project was our second contract from QFF, delivered on time, on budget and got us preferred contractor status with them.